HYDERABAD: Federal Minister for Energy Khurram Dastgir on Thursday inaugurated the 500-kilovolt Thar-Matiari transmission line.He visited Noh Hotiani village in Matiari district where he inaugurated the 500KV Thar-Matiari transmission line.According to a spokesperson for the National Transmission & Despatch Company (NTDC), the project was completed in a record period of two-and-a-half months. The 220-kilometre-long transmission line connecting Thar with the national grid cost around Rs20 billion.
Earlier, Dastgir spoke at a ceremony organised by the NTDC in connection with the inauguration of the transmission line at a hotel in Hyderabad. Talking to the media at the ceremony, he said the project of the power line from Thar to Matiari was founded in 2017, the cost of which was set at Rs21 billion, but due to the integrity of the current government, it was saved by one billion rupees.
ISLAMABAD: Pakistan has formally decided to overhaul its energy transmission sector with the restructuring of National...
ISLAMABAD: Prime Minister Shehbaz Sharif on Saturday visited the “Cascade” Police Service Centre, which was...
ISLAMABAD: The Jamiat Ulema-e-Islam-Fazl (JUIF) on Saturday categorically rejected the media reports claiming that...
By News DeskQUETTA: A suicide bombing at the Quetta Railway Station on Saturday morning claimed the lives of 26...
ISLAMABAD: The Indian government is once again playing “spoilsport” as the latest reports from across the border...
ISLAMABAD: Pakistan’s fight against polio suffered another setback when one more child was paralysed by the virus in...
SWABI: Khyber Pakhtunkhwa (KP) Chief Minister Ali Amin Gandapur on Saturday said the Pakistan Tehreek-e-Insaf (PTI)...
GAZA STRIP: Gaza’s civil defence agency said on Saturday that Israeli air strikes killed at least 14 Palestinians...